Mathematics 4

Starting in Spring 2025, I have been photographing the construction of the University of Waterloo's Mathematics 4 (M4) building as it has progressed. I also have some other pictures from before then. I have created this award-winning page (and others) to organize these images and show the progression of M4's construction. This page includes all photos in my collection from the second half of 2025. To shorten load times, all images on this page have been adjusted to 720p resolution. Click on an image to see it in full resolution.

Special thanks to the owner of pinniped.page, who provided some of the late 2024 and October 2025 photos for use on this page. He also gave me an award for this page.

July 2025

Start of construction from the MC-Student Life Centre (SLC) bridge
A closer look at the construction, July 2025
Start of construction at sunrise, July 2025
A closer look at the construction site from the previous picture.

August 2025

Concrete columns and the elevator shaft rose up, August 2025.
Another perspective from the MC-SLC bridge.

September 2025

Start of steel construction as seen from MC-Student Life Centre (SLC) bridge
A closer look at the steel construction, September 2025

October 2025

Early October

Photos in this section have been provided by the owner of pinniped.page.

Partly complete steel construction, October 2025.
View of the concrete elevator shafts and/or stairwells, October 2025.

Late October

Mostly complete steel construction, October 2025.
A closer look at the steel beams, October 2025.
East-side perspective on the steel construction, October 2025
Mostly complete steel construction, October 2025

November 2025

I visited the University of Waterloo twice in November 2025 and took pictures of M4 during both visits.

Mostly complete steel construction, November 2025.
Ruffled slabs on the beams, November 2025.
East-side perspective on the steel construction, November 2025
Ruffled steel plates covering most floors on the west side of the building, November 2025.
Eastern extent of the ruffled steel plates, November 2025.
East-side perspective showing frame mostly done, November 2025

December 2025

Not much progress was made between my late November and mid-December visits.

Northeast side showing mostly completed frame, December 2025.
Further steel frame progress on the east side, December 2025.
Northeast extent of steel frame, December 2025
Frame near MC building complete with steel ruffle plates partly done, December 2025